PT Anugerah Bumi Mahakam

IUJP permit no. 91202081614130003

Exploration, Mining Contracting, and Heavy Equipment Rental services. Since 2012.

Rain Group
Excavator and motor grader at an open mine

Our Statistics

14
Years operating, 2012 to 2026 20122026
315,044BCM
Overburden removed, January–March 2026 24,035ton Coal produced, January–March 2026
100% RFU
All main TGM fleet units ready for use 3 50T excavators, 3 20T excavators, 18 dump trucks
3,990thousand MT
Total Tayan Hilir bauxite production, 2021 to 2023 2021 2,294 2022 1,666 2023 30.4
212employees
Total PT ABM workforce

About PT Anugerah Bumi Mahakam

Experienced since 2012. Providing Exploration, Mining Contracting, Heavy Equipment Rental, Permitting, Mining Safety, Reclamation, Post-Mining, and Mining Environmental Services.

PT Anugerah Bumi Mahakam Company Profile PDF, 4.0 MB View PDF (opens in a new tab)

Vision

To be a continuously growing and sustainable company founded on moral values, integrity, and excellence.

Mission

  • Drive growth while considering social and environmental impacts.
  • Uphold transparent and accountable corporate governance across all operations.
  • Deliver an excellent, sustainable business strategy founded on ethics and integrity.
ABM team member at a mining work site
ABM team member at a work site.

At the work site

Good decisions start with conditions on the ground.

People, equipment, and working rhythm meet at the site. This image shows the field side of Anugerah Bumi Mahakam services.

PITS

PITS work culture

Reinforced at every jobsite and on every shift. Learn more about our company’s Core Values.

P

Professional

Initiative

Ability to work smartly and skillfully without having to always wait for instructions or being told what to do. Contributing in meetings or decision-making.

Responsibility

Focus on completing responsibilities and tasks thoroughly according to deadlines.

Excellence

Committed to putting in extra effort in carrying out responsibilities and tasks to produce the best output.

I

Integrity

Honesty

Stating what is true, not lying or speaking things inconsistent with facts.

Accountability

Always taking full responsibility for the consequences, results, or impacts of an action.

Trustworthiness

Consciously and thoughtfully avoiding conflicts of interest that could compromise judgment, decisions, and actions. Consistently manifesting it through real action.

T

Team Work

Communication

Possessing two-way communication skills to listen, understand situations, and discuss complex issues effectively and straight to the point.

Leadership

Having skills to influence, motivate, or direct the team to achieve targets (without taking credit for others' work).

Team Spirit

Capable of collaborating within teams as well as across departments to share knowledge and find solutions to problems.

S

Sustainability

Humility

Ability to recognize mistakes, knowledge gaps, and imperfections within oneself.

Adaptability

Developing an open and adaptive mindset to drive company success while maintaining a balance between economic interests, social care, and environmental sustainability for long-term value for all stakeholders.

Ownership

Wholeheartedly safeguarding, protecting, and caring for company success. Prioritizing collective good and progress over personal interest while maintaining principles of truth and equal opportunity.

Aerial view of workers in helmets and safety vests lined up for a safety assembly in front of the site office

K3LH

Health, Safety, and Environment

HSE (K3LH) covers protecting every worker at the mine site and taking responsibility for the environment around operations.

  • Safety talk & P5MField teams gather for a safety talk and P5M (five-minute talk) before work begins.
  • Tailing managementAt Tayan Hilir, 8 long-arm excavators normalised tailing ponds to reduce embankment failure risk.
  • Reclamation & post-miningPermitting, mine safety, reclamation, land rehabilitation, and post-mining management services.

Our Clients and Partners

  • PT Loa Haur
  • PT Tuhup Coal Mining
  • PT Batubara Sinergi Perkasa
  • PT Tadjahan Antang Mineral
  • PT Tuah Globe Mining
  • PT RAIN Realty

Mining services, from upstream to downstream

This synergy ensures upstream-to-downstream data accuracy for mine owners, reduces reserve deviation risks, and accelerates production execution. Select a stage to view its details.

Accurate baseline data

Initial topographic mapping and geophysical surveys form the basis of the entire mine plan.

  • Topographic mapping of the concession area
  • Initial geophysical surveys
  • Geological and structural geology mapping

From core drilling to a 3D model

Drilling, 3D modelling, and mine planning to JORC/KCMI standards for resource estimation.

  • Infill and confirmatory drilling, plus trenching
  • Jacro 175 to 400 drilling rigs for different depths
  • Micromine, Surpac, and Minescape software

Production with cost control

Lean Model execution with a Fleet Management System (FMS) in the contractor division.

  • Fleet monitored with a Fleet Management System
  • Stable revenue run-rate with strict operating cost control
  • 100% RFU across the main fleet at TGM Jobsite

Regulatory compliance and environmental care

Regulatory compliance and ESG implementation throughout every mining activity.

  • Mining permits and safety
  • Land reclamation and rehabilitation
  • Post-mining and mining environmental management

Supporting services: Permitting, Mining Safety, Reclamation, Post-Mining, and Mining Environmental Management.

Exploration Division

Mapping, drilling, trenching, and resource modelling for mine owners. Filter the portfolio by work type or client.

View exploration details
Type
Client

9 of 9 projects shown

PT Loa Haur

105 Ha Topographic Mapping

Mapping
PT Tuhup Coal Mining (TCM)

1,000 Ha Topographic Mapping (BSP)

Mapping
PT Tuhup Coal Mining (TCM)

6,731 Ha Geological Mapping (BSP)

Mapping
PT Tadjahan Antang Mineral (TAM)

Coal Modelling

Modelling
PT Tuah Globe Mining (TGM)

Structural Geology Mapping

Mapping
PT Tuah Globe Mining (TGM)

Infill Drilling

Drilling
PT Tadjahan Antang Mineral (TAM)

Confirmatory Drilling & Trenching

Drilling Trenching
PT Loa Haur

105 Ha Drilling & Trenching

Drilling Trenching
PT Tuhup Coal Mining (TCM)

Confirmatory Drilling (BSP)

Drilling

Find a drilling rig for the target depth

Adjust the target depth to see the Jacro drilling rig that matches our capabilities.

Micromine Origin Geovia Surpac Minescape

3D mining software for JORC/KCMI resource estimation. Supporting equipment includes HQ Pipe and other geological exploration items. A LiDAR UAV drone is being procured.

ABM drilling rig at a work site
ABM drilling rig at a work site.
0 m 100 m 150 m 300 m 450 m
120metres
Suitable unit Bor Jacro 200 Capability: 100 m to 150 m.

Initial guidance based on the equipment capabilities in the company profile. Final selection follows the technical team review.

Contractor Division

Strong capabilities and a deep understanding of mining operations. Select an activity to see its position in the mining cycle.

View contractor details
Land Clearing OB Removal Coal / Ore Getting Hauling Road Maintenance Stockpile Management Barging Heavy Equipment Rental
Several excavators and dump trucks at an open mine
Heavy equipment fleet at the mine site

Land Clearing

Opening and clearing the land before the mining area is developed.

Initial operating stage

OB Removal

Excavating topsoil and overburden to expose the coal or mineral seam.

TGM: 3 units of 50T excavators Loa Haur: 5 units of 50T excavators (2027 plan)

Coal / Ore Getting

Extracting coal or minerals from the exposed seam.

TGM: 3 units of 20T excavators Loa Haur: 4+1 spare 20T excavators (2027 plan) Bauxite: Tayan Hilir and Sanggau

Hauling

Transporting overburden and coal, including material for embankment construction.

TGM: 18 dump trucks Loa Haur: 35 dump trucks (2027 plan) Tayan Hilir: ±180 units of 20T dump trucks

Road Maintenance

Maintaining haul roads so the hauling cycle remains smooth and safe.

Haul road from pit to washing plant: 6–12 km (Sanggau)

Stockpile Management

Managing coal or ore stockpiles before shipment to the jetty.

Loa Haur: jetty stockpile Sanggau: washing plant to stockpile, 300–500 m

Barging

Transporting material by barge from the jetty to the mother vessel.

Sanggau: jetty located 800 m from the stockpile

Heavy Equipment Rental

Rental of heavy equipment, dump trucks, and light vehicles.

Excavator Dump truck Light vehicle

Active projects and track record

TGM is active, Loa Haur is in ramp-up with a 2027 fleet plan, and two bauxite projects in West Kalimantan are complete. Select the timeline or tabs to move between projects.

Sanggau regulatory pause Tayan
Hilir
TGM Loa Haur

Sanggau, Kalimantan Barat

Commodity: Bauxite

Completed

Fleet formation

Excavator PC300 10
Ore getting
Excavator PC200 8
Loading to the washing plant
Dump truck 20T 15–20
Medium-distance route
Washing plant 2
Supported by 2 long-arm units for tailing

Annual production total, thousand MT

4,8 to 2013
129,3 2018
291,5 2019
128,9 2020

Production paused from 2014 to 2017 following a regulatory change that prohibited raw bauxite ore exports. Operations resumed in 2018.

  • Annual performance peaked in 2019 at 291.5 thousand MT.
  • Hauling: pit to washing plant 6–12 km, washing plant to stockpile 300–500 m, and jetty 800 m from the stockpile.
  • Quality control: optimised oversize crushing maintained bauxite quality before barging.

MEDIA

Latest News & Activities

The latest from the field: operational achievements, CSR activities, and HSE.

All news

Discuss Your Exploration Needs and Mining Projects With Us.

Select your requirements and we will contact you to discuss the scope of work or a Joint Operation arrangement.

Head office
Treasury Tower Lt. 38 Unit A, District 8
SCBD Lot-28 Jl. Jend. Sudirman Kav 52–53, Kebayoran Baru
Jakarta Selatan 12190

Send an enquiry

Requirements (select more than one if needed)